Ambitious Lincolnshire Reservoir Project Eyes 2031 Start
A potential reservoir, planned to be established in Lincolnshire and intended to supply water to almost 750,000 households, could see construction commence as soon as 2031, provided it receives the required approvals. Anglian Water has selected land to the south of Sleaford for this substantial infrastructure development. Preliminary survey work is planned to start shortly, however, the organisation has died down the fears of local inhabitants, confirming that these surveys do not signal the immediate start of construction.
The earlier version of this news was reported by www.bbc.com and was later reworked by The Lincoln Post.